Description
|
Construction of the north two lanes of an ultimate four-lane, divided urban arterial. The project includes construction of a six-foot wide sidewalk and an urban storm water drainage system, including detention ponds for water quality. At at-grade railroad crossing with signalization was constructed in coordination with Capital Metro. The project was designed by Carter Burgess and constructed by J.C. Evans Construction Company.
|