Lakeline Blvd. at US 183

Location: Intersection of Lakeline Blvd and US 183 southbound frontage road
Description: Improvements on Lakeline Blvd to improve traffic flow and operation of the intersection.  Construction will create dual right turn lanes from Lakeline Blvd. to southbound US 183.
Status:

The design engineer is Kimley Horn.  Design is complete.  Contractor is Levy. Project is anticipated to be completed in late Fall 2014.

Contact Email roads@wilco.org or phone 512-260-4280

Project Map


View 2.45 Lakeline Blvd. at US 183 in a larger map