Project Description

Location From FM 1660 to CR 368/369.
Description The design section includes an interim 2-lane facility to match the section currently under construction, with an ultimate plan for a 4-lane divided section. 
Status Construction contract was awarded to Chasco.  A groundbreaking was held on October 28, 2011.  A ribbon cutting ceremony was held on Thursday, December 20, at 1:30 p.m.  Construction is expected to begin Wednesday, October 23, to place stop signs on FM 1660 and remove the stop signs from Chandler Road as part of intersection changes resulting from a traffic study.  The traffic study indicated that Chandler Road is more heavily traveled than FM 1660, so the traffic will be allowed continuous flow in the more heavily traveled direction.  The change should be completed by the end of that week, weather permitting.  Expect delays while traveling through the intersection. 

Contact
Email roads@wilco.org or phone 512-846-1190

Map

To see a bigger version of this map click here

This data is for general planning purposes only. The basemap conforms to National Map Accuracy Standards in unobstructed areas. Williamson County makes no warranty, representation or guarantee as to the content, sequence, accuracy, timeliness or completeness of any of the database information or spatial locations depicted. Furthermore, all warranties on merchantability and fitness for a particular purpose are hereby disclaimed. In no event shall Williamson County be liable to the recipient or any other party for damages of any type, including but not limited to incidental, consequential or exemplary damages arising out of the use or inability to use these materials.

Road Bond Program
--