San Gabriel Parkway Phase I

Location From Halsey Drive to the proposed CR 273 extension.
Description Construction included two 12 foot lanes of the ultimate 4-lane design, 8 foot wide shoulders, and a 14 foot center turn lane at US 183, water line encasement, drainage culverts, pavement markings, and signage.  This project was designed by Malone/Wheeler and constructed by J.C. Evans Construction.
Status Construction was completed in January 2007.  The road is open for public use.  