GO
Home
+
Projects
+
Precinct 1
1.30) Great Oaks Drive Bridge at Brushy Creek
P224) North Mays Street Extension Phase 1
P227) University Blvd Widening
P258) IH 35 Corridor Operational Analysis
P284) Hairy Man Rd/Brushy Creek Rd Safety Improvements
P329) O'Connor Signals
P309) Pond Springs Drainage Study
1.29) RM 620 Overpass at Railroad/Chisholm Trail Project
1.31) Forest North Drainage Improvements
+
Precinct 2
P271) Seward Junction Southeast
P285) CR 200
P438) Bagdad Road at CR 278
P277) CR 258 Extension (US 183 to Sunset Ridge Drive)
Liberty Hill Bypass
P274) Seward Junction Southwest
+
Precinct 3
Ronald Reagan Extension
3.44) CR 110 North
3.43) University Boulevard Expansion
P231) Ronald Reagan Boulevard at IH35
P231) IH 35 Frontage Road Conversion and Ramp Reversals
P237) SH 29 at DB Wood Intersection Improvements
P241) CR 176 at RM 2243
P249) CR 111/CR 105 (FM 1460 to SH 130)
P306) CR 305 at IH35 Phase 1 Bridge Replacement
P261) CR 110 Middle
+
Precinct 4
P269) CR 101
4.52) University Boulevard Expansion
P228) Kenney Fort Boulevard
P261) CR 110 Middle
4.51) CR 110/Arterial A Area Study
Corridor D / Ronald Reagan Extension
4.35) FM 1660 (PTF)
P332) FM 3349 at US 79
Oak Bluff
P296) CR 366 Widening
P302) SH 130 Frontage Roads Phase 3
TxDOT Pass-Through Projects
Vendors
Subscriptions
Reports
-
Archive
Weekly and Monthly Reports
+
Completed Projects
+
Precinct 1
1.05 Lakeline Boulevard
1.06 McNeil Road Phase I
1.07 McNeil Road Phase II
1.17 Pond Springs Road
1.25 King of Kings Crossing
1.24 RM 620/SH 45/Pearson Ranch
Wyoming Springs Dr
1.19 RM 620 Safety Improvements
P235) RM 620 Phase 2
1.31) Forest North Drainage Improvements
P221) Pearson Ranch Road
P278) Neenah Avenue Widening
P281) O'Connor Drive North of RM 620
+
Precinct 2
2.09 Ronald Reagan North Phase I
2.13 CR 214 Phase 2A
2.17 San Gabriel Parkway Phase I
2.21 CR 175 Extension Phase 2A
2.35 US 183 @ FM 3405 Signal
2.36 US 183 @ FM 3405 Turn Lane
SH 29 Improvement Study
P314 Nameless Road/Old 2243
P242 Little Elm Trail
Seward Junction Study
RM 1431
2.53 Cedar Park ILA Projects
2.52 RM 1431 at Parmer Ln/Reagan Blvd. Intersection Improvements
2.51 CR 277
2.46 County Road 258 Phase 2
Lakeline Blvd. Phase 3
2.40 Lakeline Blvd
Hero Way
US 183 (PTF)
P318) Anderson Mill Road
P282) New Hope Drive Phase I
P328) Ronald Reagan Bvld Improvements @ Santa Rita Blvd
P317) Bagdad Road North
2.50) Bagdad Road
P331) Lakeline Blvd Right Turn Lanes
P439) San Gabriel Ranch Road Bridge at Lackey Creek
+
Precinct 3
3.23 SH 29/CR 104 Phase I
P293 Kauffman Loop Phase 1
P291 SH 29 at Cedar Hollow Road
P234 RM 2243 at Escalera Parkway
3.39 CR 245
3.37 SH 195 Project 3
3.36 SH 195 Project 2
3.34 SH 195 Project 1
3.33 CR 175 Extension, Phase 2B
RM 2338
3.27 IH-35 Northbound Ramps
P262) FM 1460 North
P253) CR 110/Arterial A Study Area
Inner Loop Safety Improvements
P243) Southwest Bypass
+
Precinct 4
4.36 Gattis School Road
P263 Tradesman Boulevard Crossing
P297 East Williamson County Events Center Access Road
P319 Gattis School Road at Winterfield
P333 CR 110 at University Boulevard
P441) Roundville Lane
4.54) CR 110 South
P214) CR 119
Presentations
Maps
GO
Home
Projects
Precinct 1
1.30) Great Oaks Drive Bridge at Brushy Creek
P224) North Mays Street Extension Phase 1
P227) University Blvd Widening
P258) IH 35 Corridor Operational Analysis
P284) Hairy Man Rd/Brushy Creek Rd Safety Improvements
P329) O'Connor Signals
P309) Pond Springs Drainage Study
1.29) RM 620 Overpass at Railroad/Chisholm Trail Project
1.31) Forest North Drainage Improvements
Precinct 2
P271) Seward Junction Southeast
P285) CR 200
P438) Bagdad Road at CR 278
P277) CR 258 Extension (US 183 to Sunset Ridge Drive)
Liberty Hill Bypass
P274) Seward Junction Southwest
Precinct 3
Ronald Reagan Extension
3.44) CR 110 North
3.43) University Boulevard Expansion
P231) Ronald Reagan Boulevard at IH35
P231) IH 35 Frontage Road Conversion and Ramp Reversals
P237) SH 29 at DB Wood Intersection Improvements
P241) CR 176 at RM 2243
P249) CR 111/CR 105 (FM 1460 to SH 130)
P306) CR 305 at IH35 Phase 1 Bridge Replacement
P261) CR 110 Middle
Precinct 4
P269) CR 101
4.52) University Boulevard Expansion
P228) Kenney Fort Boulevard
P261) CR 110 Middle
4.51) CR 110/Arterial A Area Study
Corridor D / Ronald Reagan Extension
4.35) FM 1660 (PTF)
P332) FM 3349 at US 79
Oak Bluff
P296) CR 366 Widening
P302) SH 130 Frontage Roads Phase 3
TxDOT Pass-Through Projects
Vendors
Subscriptions
Reports
Archive
Weekly and Monthly Reports
Completed Projects
Precinct 1
1.05 Lakeline Boulevard
1.06 McNeil Road Phase I
1.07 McNeil Road Phase II
1.17 Pond Springs Road
1.25 King of Kings Crossing
1.24 RM 620/SH 45/Pearson Ranch
Wyoming Springs Dr
1.19 RM 620 Safety Improvements
P235) RM 620 Phase 2
1.31) Forest North Drainage Improvements
P221) Pearson Ranch Road
P278) Neenah Avenue Widening
P281) O'Connor Drive North of RM 620
Precinct 2
2.09 Ronald Reagan North Phase I
2.13 CR 214 Phase 2A
2.17 San Gabriel Parkway Phase I
2.21 CR 175 Extension Phase 2A
2.35 US 183 @ FM 3405 Signal
2.36 US 183 @ FM 3405 Turn Lane
SH 29 Improvement Study
P314 Nameless Road/Old 2243
P242 Little Elm Trail
Seward Junction Study
RM 1431
2.53 Cedar Park ILA Projects
2.52 RM 1431 at Parmer Ln/Reagan Blvd. Intersection Improvements
2.51 CR 277
2.46 County Road 258 Phase 2
Lakeline Blvd. Phase 3
2.40 Lakeline Blvd
Hero Way
US 183 (PTF)
P318) Anderson Mill Road
P282) New Hope Drive Phase I
P328) Ronald Reagan Bvld Improvements @ Santa Rita Blvd
P317) Bagdad Road North
2.50) Bagdad Road
P331) Lakeline Blvd Right Turn Lanes
P439) San Gabriel Ranch Road Bridge at Lackey Creek
Precinct 3
3.23 SH 29/CR 104 Phase I
P293 Kauffman Loop Phase 1
P291 SH 29 at Cedar Hollow Road
P234 RM 2243 at Escalera Parkway
3.39 CR 245
3.37 SH 195 Project 3
3.36 SH 195 Project 2
3.34 SH 195 Project 1
3.33 CR 175 Extension, Phase 2B
RM 2338
3.27 IH-35 Northbound Ramps
P262) FM 1460 North
P253) CR 110/Arterial A Study Area
Inner Loop Safety Improvements
P243) Southwest Bypass
Precinct 4
4.36 Gattis School Road
P263 Tradesman Boulevard Crossing
P297 East Williamson County Events Center Access Road
P319 Gattis School Road at Winterfield
P333 CR 110 at University Boulevard
P441) Roundville Lane
4.54) CR 110 South
P214) CR 119
Presentations
Maps
|
Login
|
Login
Maps
Archive
>
Maps
Maps
Construction Progress (Updated 4-2013)
Completed Road Bond Projects Through 2010
Documents
Title
Modified Date
Size
Completed Bond Funded Maintenance and Studies/Planning
4/30/2018
4.66 MB
Projects Map
4/30/2018
4.66 MB
Pass-Through Financing Map
4/30/2018
3.98 MB
Multi-Corridor Transportation Plan Map
4/30/2018
380.24 KB
10-13-09 2035 Network Map
10/31/2018
2.19 MB
10-19-09 2015 Network Map
10/31/2018
1.16 MB