Completed Projects

Archived Completed Projects

Precinct 1

1.01) Anderson Mill Road

1.02) Avery Ranch Blvd.
1.03) Lake Creek Drainage – Phase 1
1.04) Lake Creek Drainage – Phase 2
1.05) Lakeline Blvd.
1.06) McNeil Road – Phase 1
1.07) McNeil Road – Phase 2
1.08) Pond Springs Road at Turtle Rock Road Signal
1.09) RM 620 Feasibility Study
1.10) Wyoming Springs Drive North Study
1.11) RM 620 Phase 1 Interim Improvements Phase - 1
1.12) CR 111/Westinghouse Road
1.16) SE Inner Loop Widening
1.17) Pond Springs Road
1.20) Wyoming Springs Dr
1.21) CR 174
1.27) South Great Oaks Drive Extension

Precinct 2


2.01) Vista Ridge Blvd.

2.02) Avery Ranch Blvd.
2.03) Brushy Creek Road
2.04) Cedar Hollow Road at SH 29
2.05) Cypress Creek Road
2.06) Lakeline Blvd.
2.07) River Bend Oaks Subdivision
2.08) Ronald W. Reagan South – Phase 1
2.09) Ronald W. Reagan North – Phase 1
2.10) CR 175 (FM 1431 to Regional Park)
2.11) CR 185
2.12) CR 200 (CR 201 to Lackey Creek Road)
2.13) CR 214 (SH 29 to Rolling Hills Drive)
2.14) CR 258 (US 183 to Sunset Ridge)
2.15) SH 29 at FM 1869
2.16) Lakeline Blvd.
2.17) San Gabriel Parkway – Phase 1
2.18) US 183 Widening at CR 274
2.19) Ronald W. Reagan South – Phase 2
2.20) Kauffman Loop
2.21) CR 175 Extension, Phase 2A
2.22) CR 179
2.23) San Gabriel Parkway Phase 2
2.26) SH 29 Improvements Study and Schematic
2.31) Brushy Creek Road
2.32) RM 1431
2.33) CR 185/Cottonwood Creek Trail
2.38) SH 29 @ CR 260/266
2.41) Seward Junction Study

Precinct 3


3.01) Chandler Road – Phase 1

3.02) Georgetown Inner Loop East
3.03) Georgetown Inner Loop East Extension
3.04) Georgetown Inner Loop – Project 1
3.05) Georgetown Inner Loop – Project 2
3.06) Georgetown Inner Loop – Project 3 Study
3.07) Georgetown Inner Loop – Project 4 Study
3.08) Georgetown Inner Loop – Project 5 Study
3.09) CR 124
3.10) CR 142
3.11) CR 145
3.12) CR 152 Bridge Replacement
3.13) CR 157
3.14) CR 175
3.15) CR 234
3.16) CR 245
3.17) CR 311
3.18) CR 314
3.19) Wyoming Springs Drive North – Study
3.20) Ronald W. Reagan Blvd. South Phase 2
3.21) Ronald W. Reagan Blvd. North Phase 2
3.22) IH-35 @ SH 29 Turnarounds (PTF)
3.23) SH 29/CR 104 – Phase I

3.24) Williams Dr
3.25) CR 104
3.28) Ronald Reagan Phase 3
3.31) Sh 29 Improvements Study and Schematic
 
Precinct 4

4.01) Bridge Replacements Phase 1

4.02) Bridge Replacements Phase 2A (CR 424)
4.03) Chandler Road – Phase 1
4.04) CR 100
4.05) CR 112 – Phase 1
4.06) CR 119
4.07) CR 122 at US 79
4.08) CR 124
4.09) CR 132
4.10) CR 136
4.11) CR 137
4.12) CR 138 & CR 139 Alignment Study
4.13) CR 300 & CR 301
4.14) CR 302
4.15) CR 347 & CR 348
4.16) CR 368 & CR 369 (CR 101 to CR 366)
4.17) CR 404
4.18) CR 412
4.19) CR 466
4.20) FM 397 at SH 95 Signal
4.21) Gattis School Road Right-of-Way
4.22) Limmer Loop – Phase 1A
4.23) Thrall School Zone
4.24) US 79 – Section 1
4.25) US 79 – Section 2
4.26) US 79 – Section 3A
4.27) Chandler Road – Phase 2
4.28) Limmer Loop – Phase 1B
4.29) CR 113/E. Old Settler's Blvd.
4.30) Limmer Loop – Phase 1C
4.31) Kenny Fort Blvd
4.33) Chandler Road Phase 3A
4.35) FM 1660 
4.36) Gattis School
4.37) US 79 Section 3
4.38) BUS 79/2nd Street
4.39) BUS 79 Drainage
4.43) FM 1460
4.44) CR 138
4.46) FM 1660 @ Landfill Road
4.49) CR 108
4.50) CR 351 @ Donahoe Creek

Road Bond Program
--