| Location: |
US 183 from South San Gabriel River
to SH 29. |
| Description: |
The improvements will include a four-lane arterial roadway with shoulders, new bridge structures over the South San Gabriel River and a wide depressed median. |
| Status: |
Construction was awarded to Dan Williams. A ribbon cutting was held on February 8, 2012. |

To view a larger version click the picture. To save right click and click "save picture as"