| Location |
|
From Creekside Meadows to RM 2243
|
|
|
| Description |
Reconstruction of a two-lane roadway to a four-lane divided section with a raised median.
|
|
|
| Status |
ON HOLD pending funding for ultimate design and construction.
|
|

To view a larger version click the picture. To save right click and click "save picture as"