| Location: |
RM 2338 from FM 3405 to Ronald W. Reagan Blvd. |
| Description: |
Upgrade from a two-lane roadway to a 5-lane rural section. The project continues the State’s 5-lane section from FM 3405 to the proposed extension of Ronald W. Reagan Blvd. This project is a Williamson County and TxDOT Pass-Through Financing project. |
| Status: |
Project is substantially completed by Joe Bland Construction. Ribbon cutting was held on November 18, 2011. |

To view a larger version click the picture. To save right click and click "save picture as"