| Location |
Ronald W. Reagan Blvd. north from RM 2338 to SH 195. |
| Description |
The design includes a new four-lane divided rural roadway, drainage culverts, bridge structures, asphalt pavement, marking and signage. |
| Status |
Groundbreaking was held April 7, 2011. Construction is expected to be completed in early 2013. |

To view a larger version click the picture. To save right click and click "save picture as"