CR 110 South

Location CR 110 South (US 79 to Limmer Loop)
Description

The project will upgrade the existing two-lane roadway to a three-lane roadway (half of an ultimate six lane facility). The schematic design and Right-of-Way footprint will consider the ultimate typical section for a six-lane divided roadway. 

For information on CR 110 North from CR 107 to north of Sam Houston Parkway, click here.

For information on CR 110 Middle from north of Limmer Loop to CR 107, click here.

Status Design is complete.  Construction contract was awarded to Chasco Constructors for the interim three-lane section. The schematic design and Right-of-Way footprint are complete for the ultimate typical section of a six-lane divided roadway. Construction began in January 2017 and is anticipated to be completed in Summer 2018.  To view the weekly update, click here.

On Saturday February 3, 2018, traffic on CR 110 was switched from the existing roadway to the newly constructed lanes east of the existing roadway.  Along with this switch, Parma Lane was re-opened to the subdivision.  The traffic will be on the newly constructed roadway from US 79 north to CR 122. All driveways on the west side of the existing roadway will be connected to the new roadway.

Contact Email roads@wilco.org or phone 512-846-1190