All Projects (Alphabetically)

 A-B
Anderson Mill Road – completed
Arterial A Phase 1
Arterial A Phase 2
Avery Ranch Blvd. – Precinct 1/Precinct 2 – completed
Bridge Replacements Phase 2A (CR 424) – completed
Bridge Replacements Phase 2 (CR 406, CR 390, CR 427) – completed
Bridge Replacements Phase 2B (CR 351 & CR 434)
Brushy Creek Road – completed
Brushy Creek Road  – In Design
BUS 79 Drainage Improvements
BUS 79/2nd Street Improvements

C
Cedar Hollow Road at SH 29 – completed
Chandler Road Phase 1 – completed
Chandler Road Phase 2 – completed
Chandler Road Phase 3A
Chandler Road Phase 3B
CR 104 – Phase 2
CR 111 (Westinghouse Road)  – completed
CR 112 – Phase 2 – completed
CR 113/E. Old Settler's Blvd. – completed
CR 119 – completed
CR 122 @ US 79 – completed
CR 124 – completed
CR 132 – completed
CR 136 – completed
CR 137 – completed
CR 138 & CR 139 Alignment Study – completed
CR 138
CR 142 – completed
CR 145 – completed
CR 152 Bridge Replacement – completed
CR 157 – completed
CR 170
CR 175 Extension
 Phase 2A -- completed
CR 175 Extension Phase 2B
CR 179
CR 185 – completed
CR 185/Cottonwood Creek Trail
CR 200 (CR 201 to Lackey Creek Road) – completed
CR 214 Phase 2A
CR 214 Phase 2B
CR 214 (SH 29 to Rolling Hills Drive) – completed
CR 234 – completed
CR 245 – completed
CR 258 (US 183 to Sunset Ridge) – completed
CR 272 – completed
CR 273
CR 300 & CR 301 – completed
CR 302 – completed
CR 311 – completed
CR 314 – completed
CR 347 & CR 348 – completed
CR 368 & CR 369 (CR 101 to CR 366) – completed
CR 404 – completed
CR 412 – completed
CR 466 – completed
Cypress Creek Road – completed

F-K
FM 397 at SH 95 Signal – completed
FM 1460 Section 2
FM 1660 @ Landfill Road
FM 1660 (PTF)

Gattis School Road ROW – completed
Gattis School Road
Georgetown Inner Loop – Project 1 – completed
Georgetown Inner Loop – Project 2 – completed
Georgetown Inner Loop – Project 3 Study – completed
Georgetown Inner Loop – Project 4 Study – completed
Georgetown Inner Loop – Project 5 Study – completed
Georgetown Inner Loop East – completed
Georgetown Inner Loop East Extension – completed
Hero Way
IH-35 @ SH 29 Turnarounds (PTF) – completed
IH-35 Northbound Frontage Road and Ramps
Kauffman Loop

L-P

Lake Creek Drainage – Phase 1 – completed
Lake Creek Drainage – Phase 2 – completed
Lakeline Blvd. – completed
Limmer Loop – Phase 1A – completed
Limmer Loop – Phase 1B – completed
Limmer Loop – Phase 1C – completed
McNeil Road – Phase 1 – completed
McNeil Road – Phase 2 – completed

O’Connor Drive Extension
O'Connor Dr. Overpass at SH 45

Pond Springs Road at Turtle Rock Road Signal – completed
Pond Springs Road 

River Bend Oaks Subdivision – completed
RM 620 Interim Improvements - Phase 1 – completed
RM 620: Cornerwood Dr. to Wyoming Springs Dr.
RM 1431
RM 2338 (PTF)

Ronald W. Reagan Blvd. North Phase 1 – completed
Ronald W. Reagan Blvd. North Phase 2 – completed
Ronald W. Reagan Blvd. North Phase 3
Ronald W. Reagan Blvd. North Phase 4
Ronald W. Reagan Blvd. South – Phase 1 – completed
Ronald W. Reagan Blvd. South – Phase 2 – completed
Ronald W. Reagan Blvd. South @ IH-35 Intersection
San Gabriel Parkway – Phase 1 – completed
San Gabriel Parkway – Phase 2
SE Inner Loop @ FM 1460 – completed

SH 29  Improvements Study and Schematic – completed
SH 29 Improvements (CR 277 to CR 200)
SH 29 @ CR 260/266
SH 29 @ Park Place Dr. & Jack Nicklaus Blvd.

SH 29/CR 104 – Phase 1
– completed
SH 29 @ FM 1869 – completed

SH 195 ROW and Utilities


T-Z

Thrall School Zone – completed
US 183 (PTF)
US 183 Widening at CR 274 – completed
US 79 – Section 1 – completed
US 79 – Section 2 – completed
US 79 – Section 3A – completed
US 79 Section 3 (PTF)
US 79 Section 5A (PTF)
US 79 Section 5B (PTF)  – completed
US 183
US 183 at FM 3405 Signal  – completed
US 183 at FM 3405 Turn Lane  – completed
Vista Ridge Blvd. – completed
Williams Drive 
Wyoming Springs Drive North Study – completed
Wyoming Springs Drive

--