Precinct 1
1.01) Anderson Mill Road – completed
1.02) Avery Ranch Blvd. – completed
1.03) Lake Creek Drainage – Phase 1 – completed
1.04) Lake Creek Drainage – Phase 2 – completed
1.05) Lakeline Blvd. – completed
1.06) McNeil Road – Phase 1 – completed
1.07) McNeil Road – Phase 2 – completed
1.08) Pond Springs Road at Turtle Rock Road Signal – completed
1.09) RM 620 Feasibility Study – completed
1.10) Wyoming Springs Drive North Study – completed
1.11) RM 620 Phase 1 Interim Improvements Phase - 1 – completed
1.12) CR 111/Westinghouse Road – completed
1.13) IH-35 Northbound Frontage Road
1.13) IH-35 Northbound Ramps
1.14) O’Connor Drive Extension
1.16) SE Inner Loop Widening – completed
1.17) Pond Springs Road – completed
1.18) O'Connor Dr. Overpass at SH 45
1.19) RM 620: Cornerwood Dr. to Wyoming Springs Dr.
1.20) Wyoming Springs Dr.
Precinct 2
2.01) Vista Ridge Blvd. – completed
2.02) Avery Ranch Blvd. – completed
2.03) Brushy Creek Road – completed
2.04) Cedar Hollow Road at SH 29 – completed
2.05) Cypress Creek Road – completed
2.06) Lakeline Blvd. – completed
2.07) River Bend Oaks Subdivision – completed
2.08) Ronald W. Reagan South – Phase 1 – completed
2.09) Ronald W. Reagan North – Phase 1 – completed
2.10) CR 175 (FM 1431 to Regional Park) – completed
2.11) CR 185 – completed
2.12) CR 200 (CR 201 to Lackey Creek Road) – completed
2.13) CR 214 (SH 29 to Rolling Hills Drive) – completed
2.14) CR 258 (US 183 to Sunset Ridge) – completed
2.15) SH 29 at FM 1869 – completed
2.16) Lakeline Blvd. – completed
2.17) San Gabriel Parkway – Phase I – completed
2.18) US 183 Widening at CR 274 – completed
2.19) Ronald W. Reagan South – Phase 2 – completed
2.20) Kauffman Loop – completed
2.21) CR 175 Extension, Phase 2A – completed
2.22) CR 179
2.23) San Gabriel Parkway – Phase II
2.24) CR 214 – Phase 2A – completed
2.25) CR 214 – Phase 2B
2.26) SH 29 Improvements Study and Schematic – completed
2.27) US 183 (PTF)
2.28) CR 272 – completed
2.29) CR 273
2.30) CR 175 Extension, Phase 2B
2.31) Brushy Creek Road
2.32) RM 1431
2.33) CR 185/Cottonwood Creek Trail
2.34) Hero Way
2.35) US 183 @ FM 3405 Signal – completed
2.36) US 183 @ FM 3405 Turn Lane – completed
2.37) SH 29 Improvements (CR 277 to CR 200)
2.38) SH 29 @ CR 260
2.39) SH 29 @ Park Place Dr. and Jack Nicklaus Blvd.
Precinct 3
3.01) Chandler Road – Phase 1 – completed
3.02) Georgetown Inner Loop East – completed
3.03) Georgetown Inner Loop East Extension – completed
3.04) Georgetown Inner Loop – Project 1 – completed
3.05) Georgetown Inner Loop – Project 2 – completed
3.06) Georgetown Inner Loop – Project 3 Study – completed
3.07) Georgetown Inner Loop – Project 4 Study – completed
3.08) Georgetown Inner Loop – Project 5 Study – completed
3.09) CR 124 – completed
3.10) CR 142 – completed
3.11) CR 145 – completed
3.12) CR 152 Bridge Replacement – completed
3.13) CR 157 – completed
3.14) CR 175 – completed
3.15) CR 234 – completed
3.16) CR 245 – completed
3.17) CR 311 – completed
3.18) CR 314 – completed
3.19) Wyoming Springs Drive North – Study – completed
3.20) Ronald W. Reagan Blvd. South Phase 2 – completed
3.21) Ronald W. Reagan Blvd. North Phase 2 – completed
3.22) IH-35 @ SH 29 Turnarounds (PTF) – completed
3.23) SH 29/CR 104 – Phase I – completed
3.24) Williams Drive (RM 2338)
3.25) CR 104 – Phase 2
3.26) CR 175 Extension, Phase 2A
3.27) IH-35 Northbound Ramps
3.28) Ronald W. Reagan Blvd. North Phase 3
3.29) Ronald W. Reagan Blvd. North Phase 4
3.30) RM 2338 (PTF)
3.31) SH 29 Improvements Study and Schematic – completed
3.33) CR 175 Extension, Phase 2B
3.34) SH 195 Right-of-Way and Utilities
3.35) SH 29 Improvements @ Park Place Dr. & Jack Nicklaus Blvd.
Precinct 4
4.01) Bridge Replacements Phase 1 – completed
4.02) Bridge Replacements Phase 2A (CR 424) – completed
4.03) Chandler Road – Phase 1 – completed
4.04) CR 100 – completed
4.05) CR 112 – Phase 1 – completed
4.06) CR 119 – completed
4.07) CR 122 at US 79 – completed
4.08) CR 124 – completed
4.09) CR 132 – completed
4.10) CR 136 – completed
4.11) CR 137 – completed
4.12) CR 138 & CR 139 Alignment Study – completed
4.13) CR 300 & CR 301 – completed
4.14) CR 302 – completed
4.15) CR 347 & CR 348 – completed
4.16) CR 368 & CR 369 (CR 101 to CR 366) – completed
4.17) CR 404 – completed
4.18) CR 412 – completed
4.19) CR 466 – completed
4.20) FM 397 at SH 95 Signal – completed
4.21) Gattis School Road Right-of-Way – completed
4.22) Limmer Loop – Phase 1A – completed
4.23) Thrall School Zone – completed
4.24) US 79 – Section 1 – completed
4.25) US 79 – Section 2 – completed
4.26) US 79 – Section 3A – completed
4.27) Chandler Road – Phase 2 – completed
4.28) Limmer Loop – Phase 1B – completed
4.29) CR 113/E. Old Settler's Blvd. – completed
4.30) Limmer Loop – Phase 1C – completed
4.31) Arterial A – Phase 1
4.32) Arterial A – Phase 2
4.33) Chandler Rd. – Phase 3A
4.34) Chandler Rd. – Phase 3B
4.35) FM 1660 (PTF)
4.36) Gattis School Road
4.37) US 79 Section 3 (PTF)
4.38) BUS 79/2nd Street Improvements
4.39) BUS 79 Drainage Improvements
4.40) US 79 Section 5A (PTF)
4.41) US 79 Section 5B (PTF)
4.42) Bridge Replacements Phase 2B (CR 351, CR 434)
4.43) FM 1460 Section 2
4.44) CR 138
4.45) CR 170
4.46) FM 1660 @ Landfill Rd.