| Location |
From Lyndhurst Drive to just west of Parmer Lane |
| Description |
Construction of the north two lanes of an ultimate four-lane, divided urban arterial. The project includes construction of a six-foot wide sidewalk and an urban storm water drainage system, including detention ponds for water quality. At at-grade railroad crossing with signalization was constructed in coordination with Capital Metro. The project was designed by Carter Burgess and constructed by J.C. Evans Construction Company. |
| Status |
Construction was completed on July 20, 2007. This project is open to the public. |