Search
  Contact Us
  Helpful Links
Program Overview
Projects
All Projects (by Precinct)
All Projects (Alphabetical)
Completed Projects
McNeil Road Phase I
Lakeline Boulevard
McNeil Road Phase II
Ronald Reagan North Phase I
Ronald Reagan North Phase II
SH 29/CR 104 Phase I
San Gabriel Parkway Phase I
CR 175 Extension Phase 2A
SH 29 Improvement Study
US 183 @ FM 3405 Signal
US 183 @ FM 3405 Turn Lane
CR 214 Phase 2A
CR 111 (Westinghouse Road)
Pond Springs Road
SH 29 Improvement Study
Gattis School Road
SE Inner Loop
RM 1431
CR 174/Hairy Man Road
CR 104, Phase II Schematic
Williams Drive
Wyoming Springs Dr
BUS 79 Drainage
FM 1460 Section 2
FM 1660 @ Landfill Rd.
Under Construction and In Design
TxDOT Pass-Through Projects
Precincts
Precinct 1
RM 620 Phase I Interim Improvements
IH-35 Northbound Ramps
IH-35 Northbound Frontage Road
OConnor Drive Extension
Oconnor Drive Overpass at SH 45
RM 620 Cornerwood Dr to Wyoming Springs Dr
king_of_kings_crossing
Precinct 2
Kauffman Loop
Seward Junction
County Road 179
San Gabriel Parkway Phase II
CR 214 Phase 2B - Route Study & Schematic
US 183 (PTF)
CR 175 Extension, Phase 2B
CR 273
Brushy Creed Road
CR 185/Cottonwood Trail
Hero Way
SH 29 @ CR 260/CR 266
SH 29 @ Park Place Dr. and Jack Nicklaus Dr.
Lakeline Blvd
SH 29 TWLTL at Liberty Hill
Precinct 3
CR 175 Extension Phase 2A
IH-35 Northbound Ramps
Ronald Reagan North Phase 3
Ronald Reagan North Phase 4
RM 2338
SE Inner Loop
CR 175 Extension, Phase 2B
SH 195 Project 1
Park Place Dr. and Jack Nicklaus Blvd
Southwest Bypass
CR 245
Precinct 4
Arterial A - Phase I
Arterial A - Phase II
Chandler Rd. Phase 3A
Chandler Rd. Phase 3B
FM 1660
US 79 Section 3
BUS 79/2nd Street
US 79 Section 5A
US 79 Section 5B
CR 138
CR 170
CR 101
CR 119
CR 108 Location: US 79 to Limmer Loop
Maps
Reports
Projects
»
Completed Projects
»
US 183 @ FM 3405 Signal
Precinct Two Current Projects
Precinct Two Current Projects
2.22) County Road 179
County Road 179
2.23) San Gabriel Parkway Phase 2
San Gabriel Parkway Phase 2
2.27) US 183 (PTF)
US 183 (PTF)
2.31) Brushy Creek Road
2.33) CR 185/Cottonwood Trail
2.34) Hero Way
2.37) SH 29 TWLTL at Liberty Hill
2.38) SH 29 @ CR 260/266
2.40) Lakeline Blvd
Williamson County Road Bond Lakeline Blvd
2.41) Seward Junction
Location
Intersection of US 183 and FM 3405.
Description
Install a new signal.
Status
Project is complete.
To view a larger version click the picture. To save right click and click "save picture as"
Copyright 2008 by Williamson County ITS  
Terms of Use  
Privacy Statement