Search
  Contact Us
  Helpful Links
Program Overview
Projects
All Projects (by Precinct)
All Projects (Alphabetical)
Completed Projects
McNeil Road Phase I
Lakeline Boulevard
McNeil Road Phase II
Ronald Reagan North Phase I
Ronald Reagan North Phase II
SH 29/CR 104 Phase I
San Gabriel Parkway Phase I
CR 175 Extension Phase 2A
SH 29 Improvement Study
US 183 @ FM 3405 Signal
US 183 @ FM 3405 Turn Lane
CR 214 Phase 2A
CR 111 (Westinghouse Road)
Pond Springs Road
SH 29 Improvement Study
Gattis School Road
SE Inner Loop
RM 1431
CR 174/Hairy Man Road
CR 104, Phase II Schematic
Williams Drive
Wyoming Springs Dr
BUS 79 Drainage
FM 1460 Section 2
FM 1660 @ Landfill Rd.
Under Construction and In Design
TxDOT Pass-Through Projects
Precincts
Precinct 1
RM 620 Phase I Interim Improvements
IH-35 Northbound Ramps
IH-35 Northbound Frontage Road
OConnor Drive Extension
Oconnor Drive Overpass at SH 45
RM 620 Cornerwood Dr to Wyoming Springs Dr
king_of_kings_crossing
Precinct 2
Kauffman Loop
Seward Junction
County Road 179
San Gabriel Parkway Phase II
CR 214 Phase 2B - Route Study & Schematic
US 183 (PTF)
CR 175 Extension, Phase 2B
CR 273
Brushy Creed Road
CR 185/Cottonwood Trail
Hero Way
SH 29 @ CR 260/CR 266
SH 29 @ Park Place Dr. and Jack Nicklaus Dr.
Lakeline Blvd
SH 29 TWLTL at Liberty Hill
Precinct 3
CR 175 Extension Phase 2A
IH-35 Northbound Ramps
Ronald Reagan North Phase 3
Ronald Reagan North Phase 4
RM 2338
SE Inner Loop
CR 175 Extension, Phase 2B
SH 195 Project 1
Park Place Dr. and Jack Nicklaus Blvd
Southwest Bypass
CR 245
Precinct 4
Arterial A - Phase I
Arterial A - Phase II
Chandler Rd. Phase 3A
Chandler Rd. Phase 3B
FM 1660
US 79 Section 3
BUS 79/2nd Street
US 79 Section 5A
US 79 Section 5B
CR 138
CR 170
CR 101
CR 119
CR 108 Location: US 79 to Limmer Loop
Maps
Reports
Projects
»
Completed Projects
»
US 183 @ FM 3405 Turn Lane
Precinct Two Current Projects
Precinct Two Current Projects
2.22) County Road 179
County Road 179
2.23) San Gabriel Parkway Phase 2
San Gabriel Parkway Phase 2
2.27) US 183 (PTF)
US 183 (PTF)
2.31) Brushy Creek Road
2.33) CR 185/Cottonwood Trail
2.34) Hero Way
2.37) SH 29 TWLTL at Liberty Hill
2.38) SH 29 @ CR 260/266
2.40) Lakeline Blvd
Williamson County Road Bond Lakeline Blvd
2.41) Seward Junction
Location
Intersection of US 183 and FM 3405.
Description
Construct left turn lanes on US 183.
Status
Project is complete.
To view a larger version click the picture. To save right click and click "save picture as"
Copyright 2008 by Williamson County ITS  