Neenah Avenue Widening

Location Neenah Avenue from Olive Hill Drive to end of Neenah Avenue
Description This project is less than one mile in length and includes the design and construction to widen the existing two-lane roadway to a four-lane divided roadway.
Status Design was completed by Stantec Consulting Services, Inc. (formerly Bury). The contractor is MA Smith Contracting. Construction was substantially completed in December 2018, and the roadway is open to traffic.. 