Location Hairy Man Road from Arrowhead Trail to Sam Bass.
 
Description This project is 2.2 miles in length and includes safety improvements between Brushy Bend Drive and Sam Bass Road. Improvements will include the addition of shoulders along the roadway, addition of rumble striping along the shoulders, and addition of turn lanes into the adjacent parks. 
Status

Design is underway by Atkins. Foodplain impact study is underway. A presentation on the project was given at the BCMUD Town Hall on April 4, 2019. Data collection for environmental due diligence is underway. Survey and geotechnical investigation work also is ongoing. Meetings with affected property owners were held in November 2018. Construction is anticipated to begin in early 2020.

The Great Oaks Drive bridge replacement project: For more information on this project, go to the project page. 

 

Project Map

Hairy Man Road Safety Improvements

Documents

 TitleModified DateSize 
Fact Sheet11/14/201851.43 KBDownload
FAQ11/14/201876.25 KBDownload
Hairy Man Road Schematic2/14/201924.23 MBDownload
HMR Typ11/13/2018194.13 KBDownload