Location:
|
Bagdad Road/CR 279 from CR 280 to SH 29
|
Description:
|
Preparing a schematic for the reconstruction of Bagdad Road from a 2-lane roadway to a 5-lane roadway within the City of Leander and 4-lane, divided roadway outside the city limits.
|
Status:
|
Design engineer is Steger Bizzell. Preliminary design is complete.
|
Contact
|
Email [email protected] or phone 512-260-4280
|