CR 305 at IH 35 Phase 1 Bridge Repacement

Location CR 305 at IH 35
Description

The project will replace the existing two-lane bridge at the intersection of CR 305 and IH 35. This is the Texas Department of Transportation's tenth Mobility35 project! The project includes reconstructing the CR 305 bridge over I-35 and realigning CR 304 East to connect to the new bridge. 

Status Design was completed by H.W. Lochner, Inc. All right-of-way has been acquired. All utility relocations have been completed. The construction contract was awarded to Capital Excavation Company. The construction project is being managed by TxDOT. A groundbreaking ceremony was held Friday, September 21, 2018. Beginning Thursday, October 31, at 7 a.m., CR 304 E will close for approximately two weeks for crews to safely tie-in CR 304 E to the newly opened CR 305 bridge. During this time, traffic wishing to use CR 304 E will be detoured to Hill Road or FM 487. For more information about this project and others currently under construction on I-35, please visit My35Construction.org
 
Contact Email [email protected] or phone 512-943-3370

Project Map

CR 305 at IH 35 Phase 1 Bridge Replacement

Project Documents

 TitleModified DateSize
CR 305 Schematic Exhibit4/30/20181.53 MB
CR 305 Plan View Exhibit4/30/20181.28 MB