CR 110 South

Location CR 110 South (US 79 to Limmer Loop)
Description       

The project will upgrade the existing two-lane roadway to a three-lane roadway (half of an ultimate six lane facility). The schematic design and Right-of-Way footprint will consider the ultimate typical section for a six-lane divided roadway. 

For information on CR 110 North from CR 107 to north of Sam Houston Parkway, click here.

For information on CR 110 Middle from north of Limmer Loop to CR 107, click here.

Status Construction contract was awarded to Chasco Constructors for the interim three-lane section. Construction began in January 2017 and was completed in May 2018. 

TxDOT installed a traffic signal at CR 110 and US 79 as of August 2018. 

Contact Email roads@wilco.org or phone 512-846-1190