CR 119

Location Proposed roadway extension for CR 119/Ed Schmidt Boulevard from Limmer Loop to Chandler Road in Hutto, Texas.
Description    The project will consist of constructing two lanes of a future four-lane roadway with shoulders and a traffic signal at CR 119 and Limmer Loop. It also includes a left-turn lane off of Chandler onto CR 119. The right-of-way footprint will consider the ultimate typical section. 
Status Final design of the interim two-lane roadway with shoulders by Stantec Consulting Services, Inc. (formerly Bury) was completed. ROW acquisition and utility relocation have been completed. An inter-local agreement with the City of Hutto was approved at the 5/16/17 Commissioners Court meeting. The construction contract was awarded to Joe Bland Construction. Construction began in December 2017 and is anticipated to be completed spring 2019. A ribbon cutting will be held on Friday, April 5, at 9:30 a.m. for the CR 119 project. The project included constructing two lanes of a future four-lane roadway with shoulders and a traffic signal at CR 119 and Limmer Loop. It also included a left-turn lane off of Chandler onto CR 119. Design engineers are Stantec Consulting Services, Inc. (formerly Bury) and the contractor was Joe Bland Construction. The project was completed in 15 months.  The cost was $6.64 million. The City of Hutto paid $1 million, and the County funded the rest with voter approved road bonds. The ceremony will be held on CR 119 just north of Limmer Loop.
 
Contact Email [email protected] or call 512-943-1195.

Project Map


View 4.48 CR 119 in a larger map