FM 3349 at US 79

Location FM 3349 at US 79
Description The project will construct dual bridges on FM 3349 over US 79 and Union Pacific Railroad.
Status Preliminary Design is underway by HDR.
Contact Email [email protected] or phone 512-943-1195

FM 3349 at US 79 Project Map