CR 305 IH35 Phase 1 Bridge Repacement

Location CR 305 at IH 35
Description The project will replace the existing two-lane bridge at the intersection of CR 305 and IH 35.
Status Design was completed by H.W. Lochner, Inc. All right-of-way has been acquired. All utility relocations have been completed. TxDOT is anticipated to let this project in July 2018. Construction is anticipated to begin Fall 2018.