RM 620 Phase 2

Location From Cornerwood to Deepwood Drive
Description This RM 620 project is approximately 2.74 miles in length and is made up of two segments.

Segment 1 (Cornerwood Drive to Wyoming Springs Drive):
This segment of roadway is a TxDOT project to restripe the existing four lane section to a six lane section.  Sidewalks along the north side of RM 620 in this segment are also planned; however funding has not been identified at this time.  

Segment 2 (Wyoming Springs Drive to Deep Wood Drive):
This segment of roadway is a Williamson County project to widen the roadway from four to six lanes and will include new curb and gutter and a raised median.  This segment will also include left and right-hand turn lanes, culverts, water-quality facilities, retaining walls and construction of sidewalk along the north side of RM 620 to fill in the current gaps.

Williamson County’s contractor, Cox Commercial, is scheduled to begin work on the Oaklands Drive and RM 620 intersection.  The work will require daily lane closures in each direction on Oaklands Drive between the hours of 9 a.m. and 4 p.m. Monday through Friday as the weather permits. The work consists installation of drainage structures, new curb and gutter and modifications to the center median to provide an additional left turn lane. The work is scheduled to take approximately four weeks to complete, but it will depend on the weather.  Access to driveways and the other side streets within the project limits will be maintained at all times.  

Status Segment 1: To be completed by TxDOT as funding becomes available.

Segment 2: The bid was awarded to Cox Commercial Construction on November 30, 2016. Construction started on January 13, 2017, and is anticipated to be completed in Spring 2018. 
Contact Email roads@wilco.org or phone 512-943-1195