CR 200

Location From SH 29 to CR 236
Description This project includes a schematic design for the reconstruction of CR 200 between SH 29 and CR 236 from an existing two lane road to a six lane divided roadway. Final design plans will be prepared for improvements at the SH 29 and CR 200 intersection and to widen CR 200 from a two lane roadway to a two lane roadway with shoulders between SH 29 to CR 201. In addition, final design plans will be prepared to construct turn lanes and shoulders at the intersection of CR 200 and Bold Sundown.
Status O’Brien Engineering Services has completed the schematic design between SH 29 and CR 236 and final design is underway for improvements between SH 29 and CR 201 and improvements at the Bold Sundown intersection. To view the maps of the sections, click here.
Contact Email roads@wilco.org or phone 512-260-4280