Login
Register
Menu
Home
Projects
Under Construction and In Design
Precincts
Precinct 1
P221 Pearson Ranch Road
1.30 Great Oaks Drive Bridge at Brushy Creek Study
1.31 Forest North Drainage Improvements
1.29 RM 620 Overpass
P224 North Mays Street Extension Phase 1
P227 University Boulevard Widening
P235 RM 620 Phase 2 Gap Project
P258 IH 35 Corridor Operational Analysis
P278 Neenah Avenue Widening
P281 O'Connor Drive North of RM 620
P284 Hairy Man Rd/Brushy Creek Rd Safety Improvements
Precinct 2
2.49 Lakeline Boulevard Right Turn Lanes
P229 RM 1431 Gap Project
P285 CR 200
P274) Seward Junction Southwest
P282 New Hope Drive Phase I
P317 Bagdad Road North
P318 Anderson Mill Road
P331 Lakeline Blvd Right Turn Lanes
P271 Seward Junction Southeast
P438 Bagdad Road at CR 278
Precinct 3
3.43 University Boulevard Expansion
3.44 CR 110 North
Inner Loop Safety Improvements
P231 Ronald Reagan Boulevard at IH 35 Bridge Replacement
P231 Ronald Reagan Boulevard
P231 IH 35 Ramp Reversals and Frontage Road Conversion
P237 DB Wood at SH29
P241 CR 176 at RM 2243
P243 Southwest Bypass
P249 CR 111/CR105
P253 CR 110 Arterial A Study Area
P261 CR 110
P262 FM 1460 North
P276 Arterial H
P306 CR 305 at IT35 Phase 1 Bridge Replacement
Precinct 4
4.35 FM 1660
CR101
P214 CR 119
4.51 Arterial A - Phase II
4.52 Chandler Road Extension
4.54 CR 110 South
4.55 CR 110
P296 CR 366 project under Pct. 4.
P302 SH 130 Frontage Roads Phase 3
P228 Kenney Fort Boulevard
P441 Roundville Lane
TxDOT Pass-Through Projects
Vendors
Subscriptions
Reports
Archive
News
Weekly and Monthly Reports
Presentations
Completed Projects
McNeil Road Phase I
Lakeline Boulevard
McNeil Road Phase II
Ronald Reagan North Phase I
Ronald Reagan North Phase II
SH 29/CR 104 Phase I
San Gabriel Parkway Phase I
CR 175 Extension Phase 2A
SH 29 Improvement Study
US 183 @ FM 3405 Signal
US 183 @ FM 3405 Turn Lane
CR 214 Phase 2A
CR 111 (Westinghouse Road)
Pond Springs Road
Gattis School Road
SE Inner Loop
RM 1431
CR 174/Hairy Man Road
CR 104, Phase II Schematic
Williams Drive
Wyoming Springs Dr
BUS 79 Drainage
FM 1460 Section 2
FM 1660 @ Landfill Rd.
Brushy Creed Road
San Gabriel Parkway Phase II
king_of_kings_crossing
US 183 (PTF)
Hero Way
SH 29 TWLTL at Liberty Hill
US 79 Section 3
RM 2338
Park Place Dr. and Jack Nicklaus Blvd
Seward Junction Study
Great Oaks Drive Extension
SH 29 @ CR 260/CR 266
BUS 79/2nd Street
Arterial A - Phase I
Chandler Rd. Phase 3A
CR 185/Cottonwood Trail
Ronald Reagan North Phase 3
CR 138
CR 108
County Road 179
Ronald Reagan North Phase 4
Lakeline Blvd. Phase 3
CR 110 C
Chandler Rd. Phase 3B
US 79 Section 5A
US 79 Section 5B
CR 101
CR 108 Location: US 79 to Limmer Loop
CR 110 B
RM 620 Phase I Interim Improvements
RM 620 Cornerwood Dr to Wyoming Springs Dr
Kauffman Loop
CR 214 Phase 2B - Route Study & Schematic
CR 175 Extension, Phase 2B
CR 273
SH 29 @ Park Place Dr. and Jack Nicklaus Dr.
CR 175 Extension Phase 2A P3
SE Inner Loop p3
CR 110 B p3
CR 110
CR 111
1.14 OConnor Drive Extension
1.18 Oconnor Drive Overpass at SH 45
3.47 Madrid Drive Improvements
3.34 SH 195 Project 1
2.45 Lakeline Blvd. at US 183
2.48 Seward Junction Improvements Schematic
3.33 CR 175 Extension, Phase 2B
2.50 Bagdad Road
4.45 CR 170
2.40 Lakeline Blvd
2.51 CR 277
P229 RM 1431 Gap Project
1.19 RM 620 Safety Improvements
2.44 US 183 at RM 1869
3.27 IH-35 Northbound Ramps
3.39 CR 245
1.24 RM 620/SH 45/Pearson Ranch
P263 Tradesman Boulevard Crossing
P319 Gattis School Road at Winterfield
P333 CR 110 at University Boulevard
P297 East Williamson County Events Center Access Road
2.53 Cedar Park ILA Projects
2.26 SH 29 Improvement Study
P293 Kauffman Loop Phase 1
P291 SH 29 at Cedar Hollow Road
P234 RM 2243 at Escalera Parkway
2.52 RM 1431 at Parmer Ln/Reagan Blvd. Intersection Improvements
P242 Little Elm Trail
2.46 County Road 258 Phase 2
P314 Nameless Road/Old 2243
P276 Arterial H Extension
Maps
Search
Projects
Precincts
Precinct 2
P438 Bagdad Road at CR 278
Bagdad Road at CR 278
Location
Bagdad Road (CR 279) at the intersection of CR 278
Description
This project consists of improvements at the intersection of Bagdad Road and CR 278. This project will include a new River Ranch Park entrance road on the west side of the intersection and reconstruction of the intersection to include acceleration and turn lanes.
Status
The design process is underway by LAN. Construction is anticipated to begin in summer 2018.
Contact
Email
roads@wilco.org
or phone 512-260-4280
Documents
Title
Size
Lakeline Blvd Right Turn Lane Improvements_Preliminary Schematic
8.75 MB
Download
Precinct Two Current Projects
2.50) Bagdad Road
P229) RM 1431 Gap Project
P271) Seward Junction Southeast
P274) Seward Junction Southwest
P282) New Hope Drive Phase I
P285) CR 200
P317) Bagdad Road North
P318) Anderson Mill Road
P331) Lakeline Blvd Right Turn Lanes
P438) Bagdad Road at CR 278
Project Map
To view a larger version click the picture. To save right click and click "save picture as"