Arterial H Extension

Location Sam Bass Road/CR 175 to Massey Way
Description This project includes the design of four lanes of Arterial H from Sam Bass Road to the existing portion of Arterial H and construction will consist of the northern two lanes.
Status Final design has been completed by Randall Jones Engineering, Inc. The construction contract was awarded to Patin Construction. Construction began in June 2016 and is anticipated to be complete in early 2018. 

Patin Construction will be closing the right lane on northbound CR 175 on Monday, November 20, 2017 between the hours of 8 am and 5 pm. The location is approximately 1 mile north of FM 1431 at the proposed Arterial H tie-in to CR 175. The lane will be closed so that the contractor can place the remaining concrete for the valley gutter on Arterial H at the CR 175 tie-in.

Contact Email roads@wilco.org or phone 512-943-3370