Completed
3.22) IH-35 @ SH 29 Turnarounds
4.41) US 79 Section 5B (FM 1063 to Milam County Line)
2.27) US 183 (San Gabriel River to SH 29)
3.27) IH-35 Northbound Frontage Road and Ramps
3.30) RM 2338 (FM 3405 to Ronald W. Reagan Blvd.)
4.37) US 79, Section 3 (E. Hutto to CR 402)
4.40) US 79, Section 5A (East of Taylor to FM 1063)
Under Construction
In Design
4.35) FM 1660 (CR 134 to CR 101)

To view a larger version click the picture. To save right click and click "save picture as"