Completed
3.22) IH-35 @ SH 29 Turnarounds
4.41) US 79 Section 5B (FM 1063 to Milam County Line)
Under Construction
2.27) US 183 (San Gabriel River to SH 29)
3.30) RM 2338 (FM 3405 to Ronald W. Reagan Blvd.)
4.37) US 79, Section 3 (E. Hutto to CR 402)
4.40) US 79, Section 5A (East of Taylor to FM 1063)
In Design
1.13) IH-35 Northbound Frontage Road and Ramps
3.27) IH-35 Northbound Frontage Road and Ramps
4.35) FM 1660 (CR 134 to CR 101)

To view a larger version click the picture. To save right click and click "save picture as"