Precinct 1 Under Construction In Design 1.13) IH-35 Northbound Frontage Road and Ramps (PTF) 1.14) O'Connor Dr. Extension 1.18) O'Connor Dr. Overpass @ SH 45 1.19) RM 620: Cornerwood Dr. to Wyoming Springs Dr.
Precinct 2 Under Construction 2.23) San Gabriel Parkway – Phase 2 2.24) CR 214 – Phase 2A 2.27) US 183 (PTF) 2.32) RM 1431 In Design 2.22) CR 179 2.25) CR 214 – Phase 2B 2.29) CR 273 2.30) CR 175 Extension – Phase 2B 2.31) Brushy Creek Rd. 2.33) CR 185/Cottonwood Creek Trail 2.34) Hero Way 2.37) SH 29 Improvements (CR 277 to CR 200) 2.38) SH 29 Improvements @ CR 260 2.39) SH 29 Improvements @ Park Place Dr. and Jack Nicklaus Blvd.
Precinct 3 Under Construction 3.24) Williams Drive/RM 2338 3.25) CR 104 - Phase 2 3.30) RM 2338 (PTF) In Design 3.27) IH-35 Northbound Frontage Road and Ramps (PTF) 3.28) Ronald W. Reagan Blvd. North Phase 3 3.29) Ronald W. Reagan Blvd. North Phase 4 3.33) CR 175 Extension - Phase 2B 3.34) SH 195 ROW and Utilities 3.35) SH 29 Improvements @ Park Place Dr. & Jack Nicklaus Dr.
Precinct 4 Under Construction 4.33) Chandler Road – Phase 3A 4.36) Gattis School Road 4.37) US 79 Section 3 (PTF) 4.38) BUS 79/2nd Street Improvements 4.39) BUS 79 Drainage Improvements 4.40) US 79 Section 5A (PTF) 4.43) FM 1460 Section 2 In Design 4.31) Arterial A – Phase 1 4.32) Arterial A – Phase 2 4.35) FM 1660 (PTF) 4.44) CR 138 4.45) CR 170 4.46) FM 1660 @ Landfill Rd. (CR 128)